Running04/03/2027Redmond, United States

Incline Vista.

The Incline Vista 50K is new on the programme: a loop out of Redmond, Oregon, that first follows the event's 20-mile route and then turns into the Maston trail system. A little over 700 m of climbing on mostly runnable trail makes it a first ultra within reach, or the first long test of the season in early April.

Date04/03/2027
LocationRedmond, United States
Distance50 km
Elevation Gain+737 m
ProfileRolling
Route ShapeLoop
Course & Elevation

Incline Vista 2027: Course, Elevation & Route Profile

The loop gathers its climbing early. After a flat opening the trail rises from about kilometre 7.5 in two steps: first two and a half kilometres at a steady five percent, then a steeper pitch from kilometre 11 that tops out at the course high point just past kilometre 13, some 300 m above the start. A long, quiet middle section follows; more than half of the whole course is close to flat.

The longest climb waits for the second half. From kilometre 32 you gain over 200 m in a little more than three kilometres, the hardest sustained work of the day, arriving with more than 30 km already in your legs. From its top the loop heads back to where it began, with start and finish at the same height.

The organiser calls the course scenic and pitches it at two groups: runners going for their first ultra, and experienced ones opening their season. Three aid stations, the first and third of them at the same spot, carry water, Coke, ginger ale, Precision products and a range of sweet and salty snacks.

Start / finish · Aid station · Redmond
Elevation profileHover over the chart
Ascent+737 m
Descent−737 m
Vert/km15.4
Highest Point1,237 m
Lowest point932 m
Slope Distribution
Flat (<2%)52.5 %
Moderate Up (2-6%)16.1 %
Steep Up (>6%)8.6 %
Moderate Down (2-6%)15.1 %
Steep Down (>6%)7.7 %
Climbs on Route
StartLengthØMax.GainCat.
km 7.52.7 km5 %9.7 %+133 mCat. 4
km 112.3 km6.9 %13.4 %+155 mCat. 4
km 16.80.5 km3.8 %5.9 %+19 m—
km 18.50.8 km3.3 %5.3 %+26 m—
km 32.23.1 km6.8 %13.2 %+211 mCat. 3
km 39.20.6 km3.5 %5.9 %+20 m—

Climb categories follow the road-cycling convention and rate the terrain itself (length and gradient) regardless of sport: Cat. 4 marks the easiest rated climbs, Cat. 1 the hardest, and HC (hors catégorie, “beyond categorization”) is reserved for the most brutal ascents. Short climbs below the Cat. 4 threshold stay unrated.

Pacing Strategy

How to pace Incline Vista.

Start

Start under control

The two early climbs tempt you to run them on fresh legs. Take the steeper pitch from kilometre 11 as a brisk hike or a very easy jog instead: at the high point you have covered only a quarter of the distance, and the climbing there costs more than it saves in time.

Mid-race

Hold your rhythm

The trap is the flat middle. It runs easily, which is exactly why it gets run too fast. Hold a pace you could talk at, and use the aid stations deliberately, because every calorie you take in here is one you need from kilometre 32.

Finish

Spend what is left

That is where the race is decided. Three kilometres at close to seven percent after more than 30 km is, for most runners, a mix of strong hiking and short running stretches. Reach the top in control and you can run the final dozen or so kilometres back to the finish rather than just survive them.

Training plan · 12 weeks

Training plan for Incline Vista: 12-week build

Base

Build the base

For most age-group runners the Incline Vista 50K takes roughly five to seven and a half hours. The effort is mostly steady and aerobic, broken by three climbing blocks, the longest of them late in the race. It asks less for speed than for endurance and the ability to keep pushing uphill after hours on your feet.

Core

Train race pace

The climb from kilometre 32 decides the day. Build long runs so that a 15 to 25 minute climb waits in their final third, and run the first half of those sessions deliberately easy. If this is your first ultra, extend your longest runs step by step to three or four hours on trail.

Specific

Rehearse the course

Practise hiking as a technique of its own: grades around five to seven percent, brisk, with short steps and working arms. Pair it with long flat stretches at an easy pace, because more than half of the course demands exactly that restraint.

Race week

Arrive fresh

With the race in early April, the long sessions fall in late winter, so plan them in good time. Test in training whether your stomach takes Coke, ginger ale and Precision products, since that is what the aid stations offer.

GPX
Courses

Download the Incline Vista course as a GPX file for your watch or bike computer.

Import into
Adaptive race preparation

Let YOUB adapt your plan for Incline Vista dynamically

Ben connects your goal, the course, current load, recovery, and calendar. Your plan stays pointed at race day even when real life is not perfectly plannable.

FAQ

Everything about Incline Vista.

How long is Incline Vista?

Incline Vista is 50 km long. That distance shapes how much aerobic endurance, pace durability, and race-specific work belong in the training plan.

How much elevation gain does Incline Vista have?

Incline Vista has around 737 m of elevation gain over 50 km. That affects pacing, muscular load, and preparation for late-race sections.

What is the route profile of Incline Vista?

Incline Vista is classified as Rolling, averaging 15.4 vertical metres per kilometre. 53% of the route is flat, 16% climbs moderately (2 to 6%) and 9% is steeper than 6%.

What climbs does Incline Vista have?

The hardest climb of Incline Vista starts at kilometre 32.2, runs for 3.1 km at an average of 6.8% and gains 211 metres. Cycling-convention rating: Cat. 3. 6 climbs are mapped in total.

Is Incline Vista a loop course?

Yes, Incline Vista is laid out as a loop: start and finish are in the same place.

Is there a GPX file for the Incline Vista course?

Yes. The Incline Vista course is on this page as a free GPX download — ready to import into Garmin, Wahoo, Komoot, Strava or any other app that reads GPX.

How should I prepare for Incline Vista?

Preparation for Incline Vista should account for 50 km, 737 m of elevation gain, current training load, and available training time. An adaptive plan helps place key sessions without ignoring recovery and real life.

What pacing strategy works for Incline Vista?

The pacing strategy for Incline Vista should reflect 50 km, 737 m of elevation gain, and your current fitness. Start controlled and keep margin for sections where the profile or fatigue makes target pace harder.

When does Incline Vista take place?

Incline Vista takes place on April 3, 2027.

Where does Incline Vista take place?

Incline Vista takes place in Redmond, United States.

Which distances does Incline Vista offer?

Incline Vista offers 3 distances — 50K: 50 km; 20 Mile: 32.19 km; 15K: 15 km.

How do I register for Incline Vista?

Registration runs through the organiser: alpinerunning.co. YOUB shows you the course, elevation profile and training plan for your preparation.

More running races