
The Wildhorse Traverse runs from Kelowna to the lakeshore at Naramata on technical singletrack, historic railway grades and remote canyons, never doubling back. It is decided between the first aid station, which can only be supplied by boat, and Chute Lake Road, where the steepest climbs of the day are stacked. Preparing for it means hiking hard uphill with twenty kilometres already in your legs.
The start is the upper parking lot of Bertram Creek Regional Park, right on Okanagan Lake. A short stretch along the shore leads into the first real climbs: one at kilometre 2.5, then a ramp from kilometre 3.8 to 5.2 that gains over 200 metres with pitches approaching 30 percent. The course then rolls through Okanagan Mountain Park before dropping back to the lake at kilometre 20.5. The first aid station sits there, remote enough that volunteers, medics and supplies arrive by boat.
The organiser calls the 14 kilometres from there to the second aid station the hardest part of the race. A steep 1.6 kilometre climb starts straight out of the aid station, a second long climb begins at kilometre 24, and further rises lead to the high point of about 960 metres around kilometre 33. At kilometre 35, where Chute Lake Road turns off to the provincial park's south parking lot, comes the only drop-bag point.
From there a long, steady descent follows the Kettle Valley Railway grade to the Smethurst parking lot at kilometre 46.5. The last 3.5 kilometres drop more steeply through Naramata, a vineyard town of about 1,600 people, to Manitou Park by the water. PACE Trail Runs, a small family-owned series, caps the field at 450 and holds the race on the unceded territory of the Syilx people; aid stations are cup-free and plate-free, and the finisher medal is handmade ceramic.
| Start | Length | Ø | Max. | Gain | Cat. |
|---|---|---|---|---|---|
| km 2.5 | 1 km | 10.9 % | 22.5 % | +104 m | Cat. 4 |
| km 3.8 | 1.4 km | 16.2 % | 30.8 % | +223 m | Cat. 3 |
| km 10.7 | 0.9 km | 6.4 % | 19.6 % | +60 m | — |
| km 16.5 | 1 km | 12.3 % | 22.8 % | +126 m | Cat. 4 |
| km 20.5 | 1.6 km | 16.5 % | 33.7 % | +264 m | Cat. 3 |
| km 24.1 | 2.9 km | 10.7 % | 27.4 % | +305 m | Cat. 3 |
| km 27.2 | 0.9 km | 8.8 % | 17.7 % | +81 m | Cat. 4 |
| km 30.4 | 0.5 km | 10.9 % | 22 % | +49 m | — |
Climb categories follow the road-cycling convention and rate the terrain itself (length and gradient) regardless of sport: Cat. 4 marks the easiest rated climbs, Cat. 1 the hardest, and HC (hors catégorie, “beyond categorization”) is reserved for the most brutal ascents. Short climbs below the Cat. 4 threshold stay unrated.
The first 20 kilometres are the approach, not the race. The steep ramp around kilometre 4 arrives early, on fresh legs, which is exactly why you hike it instead of running it. Find your rhythm on the rolling section through the park, but every bit of effort you spend there is missing once you leave the first aid station.
That is where the race is decided. The first aid station carries limited supplies, and the 14 kilometres to the second hold the longest and steepest climbs, pitches over 30 percent included. Leave the lake with full bottles and budget this stretch in hours, not kilometres. Some years there are streams on course; do not count on them.
The trap lies beyond the high point. From kilometre 35 the old railway grade falls at only about 2 percent for many kilometres, which invites running and also demands it: if you overspent in the middle, you shuffle here while others make up time. The final 3.5 kilometres into Naramata are steeper and hit the quads once more.

The Wildhorse Traverse is a long day on your feet with a ten-hour time limit. The effort is mostly aerobic, but in the opening third and above all between kilometres 20 and 35 it is broken up by steep hiking that briefly pushes you to threshold. After that the demand flips: on the old railway grade you have to keep running steadily for a long way.
So train both halves. For the middle section the key is strong power hiking on very steep ground, ideally inside long runs that save the hardest climb for after two or three hours. For the finish you need to run a gentle downhill on tired legs and still handle a steeper final descent cleanly.
Early May in the Okanagan brings variable temperatures, and the organiser explicitly asks runners to plan for being stuck out on course and getting cold. A jacket, an emergency blanket, at least 1.5 litres of fluid capacity and 400 calories are mandatory; a toque, gloves, a warm layer and bear spray are recommended. Do your long runs carrying that weight, and get used to a foldable cup and bowl, because the aid stations provide none.
Practise self-sufficiency too: plan long sessions in which you cover 14 kilometres of demanding terrain on only what you carry. Technical singletrack in training pays off over the first twenty kilometres, where you want to save energy rather than spend it on roots and rocks.

Download the Wildhorse Traverse course as a GPX file for your watch or bike computer.
Ben connects your goal, the course, current load, recovery, and calendar. Your plan stays pointed at race day even when real life is not perfectly plannable.
Wildhorse Traverse is 50 km long. That distance shapes how much aerobic endurance, pace durability, and race-specific work belong in the training plan.
Wildhorse Traverse has around 1,651 m of elevation gain over 50 km. That affects pacing, muscular load, and preparation for late-race sections.
Wildhorse Traverse is classified as Mountainous, averaging 33.9 vertical metres per kilometre. 25% of the route is flat, 10% climbs moderately (2 to 6%) and 21% is steeper than 6%.
The hardest climb of Wildhorse Traverse starts at kilometre 24.1, runs for 2.9 km at an average of 10.7% and gains 305 metres. Cycling-convention rating: Cat. 3. 8 climbs are mapped in total.
No, Wildhorse Traverse is a point-to-point course: start and finish are in different places.
Yes. The Wildhorse Traverse course is on this page as a free GPX download — ready to import into Garmin, Wahoo, Komoot, Strava or any other app that reads GPX.
Preparation for Wildhorse Traverse should account for 50 km, 1,651 m of elevation gain, current training load, and available training time. An adaptive plan helps place key sessions without ignoring recovery and real life.
The pacing strategy for Wildhorse Traverse should reflect 50 km, 1,651 m of elevation gain, and your current fitness. Start controlled and keep margin for sections where the profile or fatigue makes target pace harder.
Wildhorse Traverse 2027 takes place on May 1, 2027.
Wildhorse Traverse 2027 takes place in Southwest Mission, Canada.
Registration runs through the organiser: pacetrailruns.com. YOUB shows you the course, elevation profile and training plan for your preparation.